Solar Steel supplies 700MW of its TracSmarT+® tracker in Spain during the first 8 months of the year
Madrid, September 9th 2019. Solar Steel, division of Gonvarri Industries has supplied 700MW of its single axis tracker TracSmart+® for PV Projects in Spain during the first 8 months of 2019. Castilla La Mancha, Extremadura, Castilla y León, AndalucÃa and Murcia are the regions where Solar Steel has been delivering the TracSmart+® solar tracker. The […]
Solar Steel supplies 258 MW of its TracSmarT+® tracker in the state of Sonora, Mexico
Madrid, July 30th 2019. Solar Steel, division of industrial giant Gonvarri Industries is supplying 7.757 single axis trackers TracSmart+® for a 258MWp PV Project located in the state of Sonora, Mexico. The project is currently under construction and its connection is expected by the first quarter of 2020. The power plant was awarded with a […]
Solar Steel supplies another 15 MW of its RackSmarT® fixed Tilt structure in the Kingdom of Saudi Arabia
Madrid, July 23th, 2019. Solar Steel, division of Gonvarri Industries has supplied another 14,92 MWp of its RackSmarT® Fixed Structure in Saudi Arabia The supplied structure will support 44.544 PV modules while de PV project is built over 30 hectares of desert. Solar Steel has fully manufactured the structure for this project in its ÇepaÅŸ […]
Solar Steel will supply three new solar-powered irrigation systems based upon TracSmarT+® single-axis tracker
Madrid, March 19th, 2019. Solar Steel, division of Gonvarri Steel Services will supply three new installations of solar-powered irrigation systems to different farming exploitations in Spain. These PV irrigation-pumping systems use the most advanced solar tracking technology, present in the single-row TracSmarT+® tracker. With these three new installations, Solar Steel will have delivered a total […]
Solar Steel supplies 93 MW of its TracSmarT® Single Axis tracker in the state of Chihuahua, Mexico
Madrid, December 17th, 2018. Solar Steel, division of Gonvarri Steel Services is supplying 93 MW of its TracSmarT® Single-Axis tracker for a PV Project located in the state of Chihuahua, Mexico. With this project, Solar Steel has supplied a total of 804 MW of TracSmarT® single-row trackers in the country. Along with its costs effectiveness, […]
Solar Steel supplies 126 MW of its TracSmarT® Single Axis tracker in Extremadura, Spain
Madrid, November 19th 2018. Solar Steel, division of Gonvarri Steel Services is supplying 126 MW of its TracSmart® Single-Axis tracker for a PV Project located in Extremadura, Spain. Along with its costs effectiveness, TracSmarT® single-row tracker minimizes installation time and cost, with wider installation tolerances reducing the land leveling and providing one of the lowest […]
Solar Steel supplies another 10 MW of its RackSmart® Fixed Structure in Bolivar Department, Colombia
Madrid, 7th June 2018. Solar Steel, division of Gonvarri Steel Services is supplying another 10 MW of its RackSmarT® Fixed Structure in Bolivar Department, Colombia. It will be its second PV plant in the country. RackSmarT® Fixed Structure minimizes installation time and cost with its customized design. Solar Steel is manufacturing RackSmarT® for this project […]
Solar Steel supplies 66 MW of its TracSmarT® Single Axis tracker in Al-Azraq, Jordan
Madrid, 23th of May 2018. Solar Steel, division of Gonvarri Steel Services is supplying 66 MW of its TracSmarT® Single Axis tracker in Al-Azraq, Jordan. Along with its costs effectiveness, TracSmarT® single-row tracker minimizes installation time and cost with wide installation tolerances reducing the land leveling and provides one of the lowest piles/MW ratios in […]
Solar Steel supplies another 34 MW of its TracSmarT® Single Axis tracker in Nacaome, Honduras
Madrid, May 10th 2018. Solar Steel, division of Gonvarri Steel Services is supplying another 34 MW of its TracSmart® Single-Axis tracker for a PV Project located in Nacaome, Honduras. It will be its third PV plant in the country. Along with its costs effectiveness, TracSmarT® single-row tracker minimizes installation time and cost with wide installation […]
Solar Steel supplies 45.6 MWp of its TracSmarT® Single Axis tracker in ChiriquÃ, Panama
The project is divided into 4 phases of 11.4 MWp each with an estimated completion date by mid-2018. For this project, it was selected the TracSmart® self-powered and wireless version, which allows additional reduction in civil works and wiring costs and makes the trackers operation independent of the grid. The Engineering and R&D resources fully […]